On Thursday, Adam and I met up with Ali at Wells to discuss the second film. Ali decided that it would be a good idea and beneficial to the Cathedral to have an appeal video for the Jesses Window on the Cathedral’s website.
We spent the day at Wells talking about the film’s requirements, the music and photographs she has and wants included.
During the course of the day we did film a few shots of the Jesse window, although due to its location it is extremely hard to get a variety of interesting shots. We went up into the very small organ room, which is located high up, which helped us get a different angle on the window. The rest of the shots were filmed from below.
To show the window’s detail within the film, we are going to have to use photographs Ali has provided, as it is impossible to get any detailed images using the camera.
On the Thursday evening Adam and I waited for the outside light to give a slight glow on the Cathedral building – although the lighting didn’t change a great deal, so we made a decision to adjust the shot in post production.
On the Friday Ali had arranged for two contributors to do interviews and pieces to camera about the Jesse Window. Friday was an early start both of us we left Weston at 7.30am to head over to Wells to get set-up ready for the first interview with a lady called Val at 10am.
Val’s interview went well, she was very knowledgeable on the Jesse window providing us with plenty of detailed and interesting content to use. Although during the interview we had to stop Val and ask her to repeat some of the information due to a buzzing or rustling from her clip mic.
The second contributor was the Cathedral Dean he did a piece to camera appealing for donations to help with the Jesse Window’s up keep. Due to his busy schedule we only had half an hour to get the material needed. This wasn’t a problem because we had already planned and organised the shot location the previous day.
That was the final shot of the day, all we need to do now is start the editing process on Monday.





